diff --git a/app/utils/construction_monitor.py b/app/utils/construction_monitor.py index ea61261..da1edb1 100644 --- a/app/utils/construction_monitor.py +++ b/app/utils/construction_monitor.py @@ -11,7 +11,12 @@ class ConstructionMonitorUtils: def __init__(self): # 原始工况周期映射表(保持不变) self.base_periods = { + "路基或预压土填筑,连续填筑":1, + "路基或预压土填筑,两次填筑间隔时间较长":7, + "预压土或路基填筑完成,第1~3个月":7, + "预压土或路基填筑完成,第4~6个月":14, "仰拱(底板)施工完成后,第1个月": 7, + "预压土或路基填筑完成,6个月以后":30, "仰拱(底板)施工完成后,第2至3个月": 14, "仰拱(底板)施工完成后,3个月以后": 30, "仰拱(底板)施工完成后,第1个月": 7, # 原:仰拱(底板)施工完成后,第1个月 @@ -27,7 +32,7 @@ class ConstructionMonitorUtils: "预制梁桥,预制梁架设后": 7, # 原:预制梁桥,预制梁架设后 "桥位施工桥梁,制梁前": 30, # 原:桥位施工桥梁,制梁前 "桥位施工桥梁,上部结构施工中": 1, # 原:桥位施工桥梁,上部结构施工中 - "架桥机(运梁车)通过": 7, # 无格式差异,保留原样 + # "架桥机(运梁车)通过": 7, # 无格式差异,保留原样 "桥梁主体工程完工后,第1至3个月": 7, # 原:桥梁主体工程完工后,第1至3个月 "桥梁主体工程完工后,第4至6个月": 14, # 原:桥梁主体工程完工后,第4至6个月 "桥梁主体工程完工后,6个月以后": 30, # 原:桥梁主体工程完工后,6个月以后 '' @@ -50,7 +55,40 @@ class ConstructionMonitorUtils: "架桥机(运梁车) 首次通过后": 7, # 原:架桥机(运梁车)首次通过后(仅加空格) "轨道板(道床)铺设后,第1个月": 14, # 原:轨道板(道床)铺设后,第1个月 "轨道板(道床)铺设后,第2至3个月": 30, # 原:轨道板(道床)铺设后,第2至3个月 - "轨道板(道床)铺设后,3个月以后": 90 # 未出现在待处理集,保留原始格式 + "轨道板(道床)铺设后,3个月以后": 90, + "架桥机(运梁车)首次通过前": 1, + "架桥机(运梁车)首次通过后,前3天": 1, + "架桥机(运梁车)首次通过后": 7, + "轨道板铺设前": 14, + "轨道板(道床)铺设后,第1至3个月": 14, + "轨道板(道床)铺设后,第4至6个月": 30, + "轨道板(道床)铺设后,6个月以后": 90, + "站场填方路基段填筑完成至静态验收": 14, + "桥墩(台)地面处拆模后": 30, + "敦身混凝土施工": 30, + # "预制梁桥,架梁前": 30, + # "预制梁桥,预制梁架设前": 1, + "预制梁桥预制梁架设后": 7, + "现浇梁,浇筑前": 30, + "现浇梁上部结构施工中": 1, + "架桥机(运梁车)通过": 2, + "桥梁主体工程完工后,第1至3个月": 7, + # "桥梁主体工程完工后,第4至6个月": 14, + "侨梁主体工程完工后,6个月以后": 30, + "轨道铺设,前": 30, + "轨道铺设,后": 14, + # "轨道铺设完成后,第1个月": 14, + # "轨道铺设完成后,2至3个月": 30, + # "轨道铺设完成后,4至12个月": 90, + # "轨道铺设完成后,12个月以后": 180, + # "仰拱(底板)施工完成后,第1个月": 7, + # "仰拱(底板)施工完成后,第2至3个月": 14, + # "仰拱(底板)施工完成后,3个月以后": 30, + # "轨道板铺设前": 14, + # "无砟轨道铺设后,第1至3个月": 30, + # "无砟轨道铺设后,4至12个月": 90, + # "无砟轨道铺设后,12个月以后": 180, + "特殊地段隧道施工完成后至静态验收": 14 } # 构建中英文括号+逗号兼容映射表 self.compatible_periods = self._build_compatible_brackets_map() diff --git a/app/utils/get_operating_mode.py b/app/utils/get_operating_mode.py index 98ac99e..3224b96 100644 --- a/app/utils/get_operating_mode.py +++ b/app/utils/get_operating_mode.py @@ -7,159 +7,246 @@ class OperatingModePredictor: 特性: 1. 输入为二维列表,每个内嵌列表对应一个point_id,且为倒序排列(最新记录在索引0) 2. 输出为一维列表,仅保留每个内嵌列表的最新记录,新增工况推导结果字段 - 3. 无需切换工况时,next_workinfo返回当前工况名称;需要切换时返回目标工况名称 + 3. 推导规则:有等效映射返回新工况,无等效保留旧工况;切换下一工况以base_periods为准 4. 时间计算仅按日期(天)维度,忽略时分秒 - 5. 支持冬休场景:当前工况为冬休时,以冬休前上一个有效工况作为切换判断依据 + 5. 冬休场景:仅以冬休前上一有效工况为判断基准,切换规则与非冬休完全一致 + 6. 适配中英文括号、逗号、空格,内部标准化匹配,外部返回规范名称 """ def __init__(self): - """初始化类,加载内置的工况配置、分组规则和切换触发规则""" - # 基础工况配置(键:工况名称,值:基础监测周期参考) + """初始化类,加载核心配置""" + # 1. 基础工况配置(最终返回的规范名称,含所有新旧工况) self.base_periods = self._load_base_periods() - # 工况分组(将同义不同格式的工况归类,共用切换规则) + # 2. 旧→新等效映射(优先返回新工况) + self.old_to_new_map = self._load_old_to_new_map() + # 3. 工况分组(同义工况归为同一分组,复用切换规则) self.condition_group = self._load_condition_group() - # 工况切换触发规则(键:分组ID,值:触发天数+目标工况候选) - self.group_transition_rules = self._load_group_transition_rules() - # 冬休工况标识(仅保留“冬休”) - self.winter_break_labels = self._load_winter_break_labels() + # 4. 切换触发规则(沿用原逻辑,触发天数+目标工况) + self.transition_rules = self._load_transition_rules() + # 5. 冬休标识 + self.winter_break_labels = {"冬休"} + + # 辅助映射:标准化名称→base_periods中的规范名称(用于最终返回) + self.std_to_canonical = { + self._standardize_name(name): name for name in self.base_periods.keys() + } + # 辅助映射:标准化名称→分组ID + self.std_to_group = { + self._standardize_name(name): group_id + for name, group_id in self.condition_group.items() + } + + def _standardize_name(self, name): + """ + 标准化工况名称(内部匹配用):去空格、统一中英文符号 + :param name: 原始工况名称 + :return: 标准化后的名称 + """ + if not name: + return "" + # 去所有空格 + std_name = name.replace(" ", "").strip() + # 统一中英文符号 + replace_map = { + "(": "(", ")": ")", ",": ",", "。": ",", "~": "至", + ";": ";", ":": ":", "'": "'", """: "\"" + } + for old, new in replace_map.items(): + std_name = std_name.replace(old, new) + return std_name def _load_base_periods(self): - """加载基础工况配置(私有方法,内部使用)""" + """加载基础工况配置(最终返回的规范名称,无多余数字)""" return { - "仰拱(底板)施工完成后,第1个月": 7, - "仰拱(底板)施工完成后,第2至3个月": 14, - "仰拱(底板)施工完成后,3个月以后": 30, + # 路基工况(新工况优先) + "路基或预压土填筑,连续填筑": 1, + "路基或预压土填筑,两次填筑间隔时间较长": 7, + "预压土或路基填筑完成,第1~3个月": 7, + "预压土或路基填筑完成,第4~6个月": 14, + "预压土或路基填筑完成,6个月以后": 30, + "架桥机(运梁车)首次通过前": 1, + "架桥机(运梁车)首次通过后,前3天": 1, + "架桥机(运梁车)首次通过后": 7, + "轨道板(道床)铺设后,第1至3个月": 14, + "轨道板(道床)铺设后,第4至6个月": 30, + "轨道板(道床)铺设后,6个月以后": 90, + + # 路基旧工况(保留,无等效则返回) + "填筑或堆载,一般情况": 1, + "填筑或堆载,两次填筑间隔时间较长情况": 7, + "堆载预压或路基填筑完成,6个月以后": 30, + "轨道板(道床)铺设后,第1个月": 14, + "轨道板(道床)铺设后,第2至3个月": 30, + "轨道板(道床)铺设后,3个月以后": 90, + + # 桥梁工况(新工况优先) + "桥墩(台)地面处拆模后": 30, + "敦身混凝土施工": 30, + "预制梁桥,预制梁架设前": 1, + "预制梁桥,预制梁架设后": 7, + "现浇梁,浇筑前": 30, + "现浇梁上部结构施工中": 1, + "架桥机(运梁车)通过": 2, + "桥梁主体工程完工后,第1至3个月": 7, + "桥梁主体工程完工后,第4至6个月": 14, + "桥梁主体工程完工后,6个月以后": 30, + "轨道铺设,前": 30, + "轨道铺设,后": 14, + "轨道铺设完成后,第1个月": 14, + "轨道铺设完成后,2至3个月": 30, + "轨道铺设完成后,4至12个月": 90, + "轨道铺设完成后,12个月以后": 180, + + # 桥梁旧工况(保留,无等效则返回) + "墩台施工到一定高度": 30, + "墩台混凝土施工": 30, + "预制梁桥,架梁前": 30, + "桥位施工桥梁,制梁前": 30, + "桥位施工桥梁,上部结构施工中": 1, + "桥梁主体工程完工后,第1至3个月": 7, + "轨道铺设期间,前": 30, + "轨道铺设期间,后": 14, + + # 隧道工况 "仰拱(底板)施工完成后,第1个月": 7, "仰拱(底板)施工完成后,第2至3个月": 14, "仰拱(底板)施工完成后,3个月以后": 30, "无砟轨道铺设后,第1至3个月": 30, "无砟轨道铺设后,4至12个月": 90, "无砟轨道铺设后,12个月以后": 180, - "墩台施工到一定高度": 30, - "墩台混凝土施工": 30, - "预制梁桥,架梁前": 30, - "预制梁桥,预制梁架设前": 1, - "预制梁桥,预制梁架设后": 7, - "桥位施工桥梁,制梁前": 30, - "桥位施工桥梁,上部结构施工中": 1, - "架桥机(运梁车)通过": 7, - "桥梁主体工程完工后,第1至3个月": 7, - "桥梁主体工程完工后,第4至6个月": 14, - "桥梁主体工程完工后,6个月以后": 30, - "轨道铺设期间,前": 30, - "轨道铺设期间,后": 14, - "轨道铺设完成后,第1个月": 14, - "轨道铺设完成后,2至3个月": 30, - "轨道铺设完成后,4至12个月": 90, - "轨道铺设完成后,12个月以后": 180, - "铺路或堆载,一般情况": 1, - "填筑或堆载,一般情况": 1, - "铺路或堆载,沉降量突变情况": 1, - "填筑或堆载,两次填筑间隔时间较长情况": 3, - "铺路或堆载,两次铺路间隔时间较长情况": 3, - "堆载预压或路基填筑完成,第1至3个月": 7, - "堆载预压或路基填筑完成,第4至6个月": 14, - "堆载预压或路基填筑完成,6个月以后": 30, - "架桥机(运梁车) 首次通过前": 1, - "架桥机(运梁车) 首次通过后,前3天": 1, - "架桥机(运梁车) 首次通过后": 7, - "轨道板(道床)铺设后,第1个月": 14, - "轨道板(道床)铺设后,第2至3个月": 30, - "轨道板(道床)铺设后,3个月以后": 90, - "冬休": 0 # 仅保留冬休 + + # 特殊工况 + "冬休": 0 + } + + def _load_old_to_new_map(self): + """加载旧→新等效映射(优先返回新工况)""" + return { + # 路基等效 + "填筑或堆载,一般情况": "路基或预压土填筑,连续填筑", + "填筑或堆载,两次填筑间隔时间较长情况": "路基或预压土填筑,两次填筑间隔时间较长", + "预压土或路基填筑完成。第1~3个月": "预压土或路基填筑完成,第1~3个月", + "堆载预压或路基填筑完成,6个月以后": "预压土或路基填筑完成,6个月以后", + "轨道板(道床)铺设后,第1个月": "轨道板(道床)铺设后,第1至3个月", + "轨道板(道床)铺设后,第2至3个月": "轨道板(道床)铺设后,第4至6个月", + "轨道板(道床)铺设后,3个月以后": "轨道板(道床)铺设后,6个月以后", + + # 桥梁等效 + "墩台施工到一定高度": "桥墩(台)地面处拆模后", + "墩台混凝土施工": "敦身混凝土施工", + "桥位施工桥梁,制梁前": "现浇梁,浇筑前", + "桥位施工桥梁,上部结构施工中": "现浇梁上部结构施工中", + "桥梁主体工程完工后,第1至3个月": "桥梁主体工程完工后,第1至3个月", + "轨道铺设期间,前": "轨道铺设,前", + "轨道铺设期间,后": "轨道铺设,后" } def _load_condition_group(self): - """加载工况分组规则(私有方法,内部使用)""" - condition_group = { - "仰拱(底板)施工完成后,第1个月": "YG_DIBAN_1", - "仰拱(底板)施工完成后,第1个月": "YG_DIBAN_1", - "仰拱(底板)施工完成后,第2至3个月": "YG_DIBAN_2_3", - "仰拱(底板)施工完成后,第2至3个月": "YG_DIBAN_2_3", - "仰拱(底板)施工完成后,3个月以后": "YG_DIBAN_AFTER_3", - "仰拱(底板)施工完成后,3个月以后": "YG_DIBAN_AFTER_3", - "架桥机(运梁车) 首次通过前": "JQJ_FIRST_BEFORE", - "架桥机(运梁车) 首次通过后,前3天": "JQJ_FIRST_AFTER_3D", - "架桥机(运梁车) 首次通过后": "JQJ_FIRST_AFTER", - "堆载预压或路基填筑完成,第1至3个月": "DZYY_1_3", - "堆载预压或路基填筑完成,第4至6个月": "DZYY_4_6", - "堆载预压或路基填筑完成,6个月以后": "DZYY_AFTER_6", - "轨道板(道床)铺设后,第1个月": "GDB_1", - "轨道板(道床)铺设后,第2至3个月": "GDB_2_3", - "轨道板(道床)铺设后,3个月以后": "GDB_AFTER_3", + """加载工况分组(同义工况归为同一分组)""" + group_map = { + # 路基分组 + "路基或预压土填筑,连续填筑": "DZ_CONTINUE", + "路基或预压土填筑,两次填筑间隔时间较长": "DZ_INTERVAL", + "预压土或路基填筑完成,第1~3个月": "DZ_FINISH_1_3", + "预压土或路基填筑完成,第4~6个月": "DZ_FINISH_4_6", + "预压土或路基填筑完成,6个月以后": "DZ_FINISH_AFTER_6", + "架桥机(运梁车)首次通过前": "JQJ_FIRST_BEFORE", + "架桥机(运梁车)首次通过后,前3天": "JQJ_FIRST_AFTER_3D", + "架桥机(运梁车)首次通过后": "JQJ_FIRST_AFTER", + "轨道板(道床)铺设后,第1至3个月": "GDB_FINISH_1_3", + "轨道板(道床)铺设后,第4至6个月": "GDB_FINISH_4_6", + "轨道板(道床)铺设后,6个月以后": "GDB_FINISH_AFTER_6", + + # 路基旧工况分组(复用新工况分组) + "填筑或堆载,一般情况": "DZ_CONTINUE", + "填筑或堆载,两次填筑间隔时间较长情况": "DZ_INTERVAL", + "堆载预压或路基填筑完成,6个月以后": "DZ_FINISH_AFTER_6", + "轨道板(道床)铺设后,第1个月": "GDB_FINISH_1_3", + "轨道板(道床)铺设后,第2至3个月": "GDB_FINISH_4_6", + "轨道板(道床)铺设后,3个月以后": "GDB_FINISH_AFTER_6", + + # 桥梁分组 + "桥墩(台)地面处拆模后": "STATIC", + "敦身混凝土施工": "STATIC", + "预制梁桥,架梁前": "STATIC", "预制梁桥,预制梁架设前": "YZLQ_BEFORE_JS", "预制梁桥,预制梁架设后": "YZLQ_AFTER_JS", - "桥梁主体工程完工后,第1至3个月": "QL_ZHUTI_1_3", + "现浇梁,浇筑前": "STATIC", + "现浇梁上部结构施工中": "STATIC", + "架桥机(运梁车)通过": "STATIC", + "桥梁主体工程完工后,第1至3个月": "QL_ZHUTI_1_3", "桥梁主体工程完工后,第4至6个月": "QL_ZHUTI_4_6", - "桥梁主体工程完工后,6个月以后": "QL_ZHUTI_AFTER_6", - "轨道铺设完成后,第1个月": "GD_1", - "轨道铺设完成后,2至3个月": "GD_2_3", - "轨道铺设完成后,4至12个月": "GD_4_12", - "轨道铺设完成后,12个月以后": "GD_AFTER_12", + "桥梁主体工程完工后,6个月以后": "QL_ZHUTI_AFTER_6", + "轨道铺设,前": "STATIC", + "轨道铺设,后": "STATIC", + "轨道铺设完成后,第1个月": "GD_FINISH_1", + "轨道铺设完成后,2至3个月": "GD_FINISH_2_3", + "轨道铺设完成后,4至12个月": "GD_FINISH_4_12", + "轨道铺设完成后,12个月以后": "GD_FINISH_AFTER_12", + + # 桥梁旧工况分组(复用新工况分组) + "墩台施工到一定高度": "STATIC", + "墩台混凝土施工": "STATIC", + "桥位施工桥梁,制梁前": "STATIC", + "桥位施工桥梁,上部结构施工中": "STATIC", + "桥梁主体工程完工后,第1至3个月": "QL_ZHUTI_1_3", + "轨道铺设期间,前": "STATIC", + "轨道铺设期间,后": "STATIC", + + # 隧道分组 + "仰拱(底板)施工完成后,第1个月": "YG_DIBAN_1", + "仰拱(底板)施工完成后,第2至3个月": "YG_DIBAN_2_3", + "仰拱(底板)施工完成后,3个月以后": "YG_DIBAN_AFTER_3", "无砟轨道铺设后,第1至3个月": "WZGD_1_3", "无砟轨道铺设后,4至12个月": "WZGD_4_12", "无砟轨道铺设后,12个月以后": "WZGD_AFTER_12", - "墩台施工到一定高度": "STATIC", - "墩台混凝土施工": "STATIC", - "预制梁桥,架梁前": "STATIC", - "桥位施工桥梁,制梁前": "STATIC", - "桥位施工桥梁,上部结构施工中": "STATIC", - "架桥机(运梁车)通过": "STATIC", - "轨道铺设期间,前": "STATIC", - "轨道铺设期间,后": "STATIC", - "铺路或堆载,一般情况": "STATIC", - "填筑或堆载,一般情况": "STATIC", - "铺路或堆载,沉降量突变情况": "STATIC", - "填筑或堆载,两次填筑间隔时间较长情况": "STATIC", - "铺路或堆载,两次铺路间隔时间较长情况": "STATIC" - } - # 冬休分组(仅冬休) - winter_break_groups = { + + # 特殊工况 "冬休": "STATIC" } - condition_group.update(winter_break_groups) - return condition_group + return group_map - def _load_group_transition_rules(self): - """加载工况切换触发规则(私有方法,内部使用)""" + def _load_transition_rules(self): + """加载切换触发规则(沿用原逻辑,以base_periods为准)""" return { - "YG_DIBAN_1": {"trigger_days": 30, "next_candidates": ["仰拱(底板)施工完成后,第2至3个月", "仰拱(底板)施工完成后,第2至3个月"]}, - "YG_DIBAN_2_3": {"trigger_days": 60, "next_candidates": ["仰拱(底板)施工完成后,3个月以后", "仰拱(底板)施工完成后,3个月以后"]}, - "YG_DIBAN_AFTER_3": {"trigger_days": None, "next_candidates": None}, - "JQJ_FIRST_BEFORE": {"trigger_days": 1, "next_candidates": ["架桥机(运梁车) 首次通过后,前3天"]}, - "JQJ_FIRST_AFTER_3D": {"trigger_days": 3, "next_candidates": ["架桥机(运梁车) 首次通过后"]}, - "JQJ_FIRST_AFTER": {"trigger_days": None, "next_candidates": None}, - "DZYY_1_3": {"trigger_days": 90, "next_candidates": ["堆载预压或路基填筑完成,第4至6个月"]}, - "DZYY_4_6": {"trigger_days": 90, "next_candidates": ["堆载预压或路基填筑完成,6个月以后"]}, - "DZYY_AFTER_6": {"trigger_days": None, "next_candidates": None}, - "GDB_1": {"trigger_days": 30, "next_candidates": ["轨道板(道床)铺设后,第2至3个月"]}, - "GDB_2_3": {"trigger_days": 30, "next_candidates": ["轨道板(道床)铺设后,3个月以后"]}, - "GDB_AFTER_3": {"trigger_days": None, "next_candidates": None}, - "YZLQ_BEFORE_JS": {"trigger_days": 1, "next_candidates": ["架桥机(运梁车)通过"]}, - "YZLQ_AFTER_JS": {"trigger_days": 7, "next_candidates": ["桥梁主体工程完工后,第1至3个月"]}, - "QL_ZHUTI_1_3": {"trigger_days": 90, "next_candidates": ["桥梁主体工程完工后,第4至6个月"]}, - "QL_ZHUTI_4_6": {"trigger_days": 90, "next_candidates": ["桥梁主体工程完工后,6个月以后"]}, - "QL_ZHUTI_AFTER_6": {"trigger_days": None, "next_candidates": None}, - "GD_1": {"trigger_days": 30, "next_candidates": ["轨道铺设完成后,2至3个月"]}, - "GD_2_3": {"trigger_days": 60, "next_candidates": ["轨道铺设完成后,4至12个月"]}, - "GD_4_12": {"trigger_days": 240, "next_candidates": ["轨道铺设完成后,12个月以后"]}, - "GD_AFTER_12": {"trigger_days": None, "next_candidates": None}, - "WZGD_1_3": {"trigger_days": 90, "next_candidates": ["无砟轨道铺设后,4至12个月"]}, - "WZGD_4_12": {"trigger_days": 240, "next_candidates": ["无砟轨道铺设后,12个月以后"]}, - "WZGD_AFTER_12": {"trigger_days": None, "next_candidates": None}, - "STATIC": {"trigger_days": None, "next_candidates": None} + # 路基切换规则 + "DZ_FINISH_1_3": {"trigger_days": 90, "next": ["预压土或路基填筑完成,第4~6个月"]}, + "DZ_FINISH_4_6": {"trigger_days": 90, "next": ["预压土或路基填筑完成,6个月以后"]}, + "DZ_FINISH_AFTER_6": {"trigger_days": None, "next": None}, + "JQJ_FIRST_BEFORE": {"trigger_days": 1, "next": ["架桥机(运梁车)首次通过后,前3天"]}, + "JQJ_FIRST_AFTER_3D": {"trigger_days": 3, "next": ["架桥机(运梁车)首次通过后"]}, + "JQJ_FIRST_AFTER": {"trigger_days": None, "next": None}, + "GDB_FINISH_1_3": {"trigger_days": 30, "next": ["轨道板(道床)铺设后,第4至6个月"]}, + "GDB_FINISH_4_6": {"trigger_days": 30, "next": ["轨道板(道床)铺设后,6个月以后"]}, + "GDB_FINISH_AFTER_6": {"trigger_days": None, "next": None}, + + # 桥梁切换规则 + "YZLQ_BEFORE_JS": {"trigger_days": 1, "next": ["架桥机(运梁车)通过"]}, + "YZLQ_AFTER_JS": {"trigger_days": 7, "next": ["桥梁主体工程完工后,第1至3个月"]}, + "QL_ZHUTI_1_3": {"trigger_days": 90, "next": ["桥梁主体工程完工后,第4至6个月"]}, + "QL_ZHUTI_4_6": {"trigger_days": 90, "next": ["桥梁主体工程完工后,6个月以后"]}, + "QL_ZHUTI_AFTER_6": {"trigger_days": None, "next": None}, + "GD_FINISH_1": {"trigger_days": 30, "next": ["轨道铺设完成后,2至3个月"]}, + "GD_FINISH_2_3": {"trigger_days": 60, "next": ["轨道铺设完成后,4至12个月"]}, + "GD_FINISH_4_12": {"trigger_days": 240, "next": ["轨道铺设完成后,12个月以后"]}, + "GD_FINISH_AFTER_12": {"trigger_days": None, "next": None}, + + # 隧道切换规则 + "YG_DIBAN_1": {"trigger_days": 30, "next": ["仰拱(底板)施工完成后,第2至3个月"]}, + "YG_DIBAN_2_3": {"trigger_days": 60, "next": ["仰拱(底板)施工完成后,3个月以后"]}, + "YG_DIBAN_AFTER_3": {"trigger_days": None, "next": None}, + "WZGD_1_3": {"trigger_days": 90, "next": ["无砟轨道铺设后,4至12个月"]}, + "WZGD_4_12": {"trigger_days": 240, "next": ["无砟轨道铺设后,12个月以后"]}, + "WZGD_AFTER_12": {"trigger_days": None, "next": None}, + + # 静态分组(无切换) + "DZ_CONTINUE": {"trigger_days": None, "next": None}, + "DZ_INTERVAL": {"trigger_days": None, "next": None}, + "STATIC": {"trigger_days": None, "next": None} } - def _load_winter_break_labels(self): - """冬休标识(仅冬休)""" - return {"冬休"} - def _parse_to_date(self, time_str): - """ - 私有辅助方法:将时间字符串解析为日期对象,仅保留年月日,忽略时分秒 - :param time_str: 时间字符串,格式为 "YYYY-MM-DD HH:MM:SS" - :return: date对象 / None(解析失败时) - """ + """解析时间字符串为date对象(仅保留年月日)""" if not time_str: return None try: @@ -168,22 +255,18 @@ class OperatingModePredictor: except ValueError: return None - def _get_time_statistics_from_reversed(self, data, workinfo): - """ - 私有辅助方法:从倒序数据中提取时间统计信息 - :param data: 单个point_id的倒序数据列表 - :param workinfo: 目标工况名称(冬休时为冬休前上一工况) - :return: 元组 (首次测量日期date对象, 首次到末次持续天数, 今日与首次测量天数差) - """ - # 筛选目标工况的有效记录(忽略冬休) + def _get_time_statistics(self, data, target_workinfo): + """从倒序数据中提取目标工况的时间统计信息""" + # 筛选目标工况的有效记录 target_records = [ d for d in data - if d.get("workinfoname") == workinfo + if self._standardize_name(d.get("workinfoname")) == self._standardize_name(target_workinfo) and d.get("workinfoname") not in self.winter_break_labels ] if not target_records: return None, 0, 0 + # 解析日期 target_dates = [] for item in target_records: d = self._parse_to_date(item.get("MTIME_W")) @@ -192,9 +275,9 @@ class OperatingModePredictor: if not target_dates: return None, 0, 0 + # 计算时间差(倒序数据:最新在0,最早在-1) last_date = target_dates[0] first_date = target_dates[-1] - cumulative_days = (last_date - first_date).days today = date.today() days_to_today = (today - first_date).days if first_date else 0 @@ -202,46 +285,19 @@ class OperatingModePredictor: return first_date, cumulative_days, days_to_today def _get_pre_winter_break_workinfo(self, inner_data_list): - """ - 私有辅助方法:从倒序数据中提取冬休前的上一个有效工况 - :param inner_data_list: 单个point_id的倒序数据列表 - :return: 冬休前工况名称 / None(未找到时) - """ + """提取冬休前的上一个有效工况""" if not inner_data_list: return None - # 倒序遍历,跳过冬休,找第一个有效工况 for record in inner_data_list: current_work = record.get("workinfoname") - if current_work and current_work not in self.winter_break_labels and current_work in self.base_periods: - return current_work + if current_work and current_work not in self.winter_break_labels: + # 优先返回等效新工况 + return self.old_to_new_map.get(current_work, current_work) return None - def _match_next_condition(self, current_name, candidates): - """ - 私有辅助方法:按符号风格匹配下一个工况名称(全角/半角括号对应) - :param current_name: 当前工况名称(冬休时为冬休前上一工况) - :param candidates: 目标工况候选列表 - :return: 匹配的工况名称 / 当前工况名称(无候选时) - """ - if not candidates: - return current_name - if "(" in current_name: - for cand in candidates: - if "(" in cand: - return cand - if "(" in current_name: - for cand in candidates: - if "(" in cand: - return cand - return candidates[0] - def _validate_point_id(self, inner_list): - """ - 私有辅助方法:校验内嵌列表内所有元素的point_id是否一致 - :param inner_list: 单个point_id的倒序数据列表 - :return: point_id / None(校验失败或列表为空时) - """ + """校验内嵌列表内point_id是否一致""" if not inner_list: return None base_point_id = inner_list[0].get("point_id") @@ -252,19 +308,21 @@ class OperatingModePredictor: def predict(self, data_2d_list): """ - 公有核心方法:执行工况预测,处理二维输入数据,返回一维结果列表 + 公有核心方法:执行工况预测 :param data_2d_list: 二维倒序数据列表,格式 [[{},{},{}], [{},{},{}]] - :return: 一维结果列表,格式 [{}, {}, {}],每个元素为对应内嵌列表的最新记录+推导字段 + :return: 一维结果列表,格式 [{}, {}, {}] """ - final_result_1d = [] + final_result = [] for inner_data_list in data_2d_list: if not isinstance(inner_data_list, list) or len(inner_data_list) == 0: continue + # 取最新记录并复制(避免修改原数据) latest_record = inner_data_list[0].copy() point_id = self._validate_point_id(inner_data_list) + # 校验point_id if not point_id: latest_record.update({ "status": "fail", @@ -275,11 +333,12 @@ class OperatingModePredictor: "judge_based_workinfo": None, "error_msg": "point_id不一致或缺失" }) - final_result_1d.append(latest_record) + final_result.append(latest_record) continue + # 获取当前工况并标准化 current_workinfo = latest_record.get("workinfoname") - if not current_workinfo or current_workinfo not in self.base_periods: + if not current_workinfo or self._standardize_name(current_workinfo) not in self.std_to_canonical: latest_record.update({ "status": "fail", "current_workinfo": None, @@ -289,10 +348,10 @@ class OperatingModePredictor: "judge_based_workinfo": None, "error_msg": "工况无效或缺失" }) - final_result_1d.append(latest_record) + final_result.append(latest_record) continue - # 冬休逻辑:当前是冬休 → 取冬休前工况作为判断基准 + # 冬休逻辑:取冬休前工况作为判断基准 if current_workinfo in self.winter_break_labels: judge_based_workinfo = self._get_pre_winter_break_workinfo(inner_data_list) if not judge_based_workinfo: @@ -305,40 +364,46 @@ class OperatingModePredictor: "judge_based_workinfo": None, "error_msg": "冬休前未找到有效工况" }) - final_result_1d.append(latest_record) + final_result.append(latest_record) continue else: - judge_based_workinfo = current_workinfo + # 非冬休:优先使用等效新工况作为判断基准 + judge_based_workinfo = self.old_to_new_map.get(current_workinfo, current_workinfo) - # 用判断基准工况计算时间 - first_dt, cumulative_days, days_to_today = self._get_time_statistics_from_reversed( + # 计算时间统计信息 + first_dt, cumulative_days, days_to_today = self._get_time_statistics( inner_data_list, judge_based_workinfo ) first_measure_date = first_dt.strftime("%Y-%m-%d") if first_dt else None - # 推导下一工况 - group_id = self.condition_group.get(judge_based_workinfo, "STATIC") - rule = self.group_transition_rules.get(group_id, {}) + # 推导下一工况(以base_periods中的名称为准) + std_judge_work = self._standardize_name(judge_based_workinfo) + group_id = self.std_to_group.get(std_judge_work, "STATIC") + rule = self.transition_rules.get(group_id, {}) trigger_days = rule.get("trigger_days") - next_candidates = rule.get("next_candidates", []) + next_candidates = rule.get("next", []) - if trigger_days is not None and cumulative_days >= trigger_days: - next_workname = self._match_next_condition(judge_based_workinfo, next_candidates) + if trigger_days is not None and cumulative_days >= trigger_days and next_candidates: + # 切换工况:取base_periods中的规范名称 + next_workinfo = next_candidates[0] else: - next_workname = judge_based_workinfo + # 不切换:有等效则返回新工况,无则返回旧工况 + next_workinfo = self.old_to_new_map.get(judge_based_workinfo, judge_based_workinfo) - # 组装结果 + # 组装最终结果 latest_record.update({ "status": "success", - "current_workinfo": current_workinfo, - "judge_based_workinfo": judge_based_workinfo, + "current_workinfo": current_workinfo, # 保留原始输入工况 + "judge_based_workinfo": judge_based_workinfo, # 实际判断用的工况(新工况优先) "first_measure_date": first_measure_date, "days_from_first_to_today": days_to_today, - "next_workinfo": next_workname, + "next_workinfo": next_workinfo, # 推导结果:有等效返回新工况,无则返回旧工况 "point_id": point_id, "error_msg": "" }) - final_result_1d.append(latest_record) + final_result.append(latest_record) + + return final_result + - return final_result_1d \ No newline at end of file